ARTIFICIAL SANDMARTIN BANK CONSTRUCTION

This project involved the construction of an artificial sand martin nesting bank as part of an environmental habitat scheme.

The works required precise groundworks, structural installation, and drainage integration to create a long-term, sustainable nesting environment within a live site.

        Scope of Works
 

  • Bulk excavation and ground preparation

  • Construction of reinforced blockwork structure

  • Installation of nesting voids

  • Drainage works including ACO channels and carrier drains

  • Formation of surrounding ground levels and finishes

20231016_124512.jpg

CHALLENGES

  • Working within an environmentally sensitive area

  • Managing water levels and drainage conditions

  • Maintaining structural accuracy for nesting requirements

  • Coordinating works within an active site

BUILDING THE SANDMARTIN STRUCTURE
20231011_091359_edited.jpg
20231011_112931.jpg
20231012_104946.jpg
20231014_101221.jpg

Key Achievements

✓

Successfully delivered works within a live operational environment

✓

Coordinated closely with multiple trades

✓

Achieved specification tolerances on levels and falls

✓

Positive end-of-project snagging report

✓

Maintained a 100% safety record with zero incidents

The completed sand martin bank has successfully provided a long-term habitat solution, demonstrating Bishops Groundworks’ capability in delivering specialist environmental and structural projects to a high standard.